热门标签

进入欧博app:Govt to focus on putting LCS project back on track, says Hishammuddin

时间:2个月前   阅读:11   评论:1

皇冠足球网址www.99cx.vip)实时更新发布最新最快最有效的皇冠足球网址,包括皇冠手机网址,皇冠备用网址,皇冠最新网址,皇冠足球网址,皇冠网址大全。

Senior Defence Minister Hishammuddin Tun Hussein says he never tires of asserting many times that the Defence Ministry and him have nothing to hide. – The Malaysian Insight file pic, August 13, 2022.

THE government will focus on putting the littoral combat ship (LCS) project back on track as decided by the Cabinet, said Senior Defence Minister Hishammuddin Tun Hussein in a post on Facebook.

He said negotiations with vendors, original equipment manufacturers (OEM) and banks are being carried out.

,

进入欧博appwww.aLLbet8.vip)是欧博集团的官方网站。进入欧博app开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

Hishammuddin said this in relation to the procurement of the combat ships which became controversial following the report of the Public Accounts Committee (Pac) revealing that not a single ship had been completed even though the project contract worth RM6.083 billion stipulated that five of the six ships should be completed and handed over by August 2022.

In the posting, Hishamuddin said his team has taken media personnel to Boustead Naval Shipyard in Lumut, Perak today to take a look at the external and internal conditions of the LCS which is under construction.

“I never get tired of asserting many times that the Defence Ministry and I have nothing to hide. At the same time, the wrongdoers must be brought to justice,” he added. – Bernama, August 13, 2022.


转载说明:本文转载自Sunbet。

上一篇:Usdt第三方支付(www.trc20.vip):Bursa ends higher, FBM KLCI breaches key 1,500 level

下一篇:皇冠管理端登3手机:New Covid-19 cases surpass 3,000 for first time in 2 months

网友评论